Davenergy Solutions is a leader in the field of hospital design, medical planning, and construction development. By understanding cultural and business needs, we help clients realize their organization’s vision and potential through responsive, innovative, and sustainable design. We achieve this through multidisciplinary collaboration, knowledge sharing, detail-oriented engineers with former facility management, and pre-design investigation.
We utilize our years of medical design experience and facility management/operational experience to assist with development, redesigns, and workflow optimization immersed in a logical, actionable approach. Drawing on our experience of healthcare facility operations and processes that we have developed working similar projects since 2009, we can gauge the value and risks of the project and make recommendations accordingly.

VISN 21 Life Safety Consultant Services
The VA Northern California Health Care System (VANCHCS) contracted with Davenergy for the Life Safety Survey and Statement of Conditions inspections of the VAMC Mather,
VISN 21 Palo Alto VA Healthcare Engineering & Project Management Support
This project directly supported the management and development of initial projects including constructability reviews, value engineering, estimates of probable construction, environmental analyses, project documentation and
VISN 18 Northern Arizona Healthcare Building Automation System Planning
The overarching goal of this project was to create, on a central server, a building automation system interface for graphics, historical data, and alarms to
VISN 21 A&E Design Services for Project 612A4-18-231 Evaluate all Pharmacy Sites for USP 797/800 Compliance and Corrections
Davenergy was engaged to provide professional engineering services to investigate, evaluate, design, test, and provide analysis and specialty services to accomplish a review of the
VISN 21 Palo Alto Construction Management Services
The major projects supported Research/Veterinary Facility ($98M), Radiology Consolidation Project ($121M), and Recreation Services Building ($21.3M) are described below and were completed at the end

VISN 21 VAPAHCS Upgrade 12kV Electrical Capacity and Re-balance of Loads on North and South Substations
Davenergy was contracted to provide 35% design development (bridging documents) to replace and upsize the existing 400-amp feeders and to re-balance loads on the North